Stochastic Flowshop Scheduling Model for Two Machines
Keywords:
Flowshop Scheduling, Transportation Times, Makespan, Utilization Times of Machine, Weighted Mean FlowtimeAbstract
In this paper, we have developed a new heuristic algorithm for n jobs two machines (
Downloads
References
Baker, K. R. (1974). Introduction to sequencing and scheduling, Wiley and Sons, New York.
Brown, A. P. G., & Lomnicki, Z. A. (1966). Some applications of the “branch-and-bound” algorithm to the
machine scheduling problem. Journal of the Operational Research Society, 17(2), 173-186.
Chandramouli, A. B. (2005). Heuristic approach for n jobs, 3-machines flow shop scheduling problem involving
transportation time, breakdown time and weights of jobs, Mathematical and Computational Application, 10(2),
-305.
Chen, B., & Lee, C. Y. (2008). Logistics scheduling with batching and transportation. European Journal of
Operational Research, 189(3), 871-876.
Dannenbring, D. G. (1977). An evaluation of flowshop sequencing heuristics, Management Science, 23(11),
-1182.
Gupta D., & Singh, T. P. (2005). On job block open shop scheduling, the processing time associated with
probability. Journal of the Indian Society of Statistics and Operations Research, 26 (1-4), 91-96.
Gupta J. N. D. (1975). Optimal schedule for specially structured flowshop. Naval Research Logistic, 22(2), 255-
Heydari, A. P. D. (2003). On flow shop scheduling problem with processing of jobs in a string of disjoint job
blocks: fixed order jobs and arbitrary order jobs. Journal of the Indian Society of Statistics and Operations, 24,
- 4.
Ignall, E., & Schrage, L. (1965). Application of the branch and bound technique to some flow-shop scheduling
problems. Operations Research, 13(3), 400-412.
Johnson, S. M. (1954). Optimal two‐and three‐stage production schedules with setup times included. Naval
Research Logistics Quarterly, 1(1), 61-68.
Lomnicki, Z. A. (1965). A branch-and-bound algorithm for the exact solution of the three-machine scheduling
problem. Journal of the Operational Research Society, 16(1), 89-100.
Maggu P. L., & Das, G. (1977). Equivalent jobs for job block in job sequencing, Opsearch, 14(4), 277-281.
Mitten, L. G. (1959). Sequencing n jobs on two machines with arbitrary time lags. Management Science, 5(3),
-298.
Miyazaki, S., & Nishiyama, N. (1980). Analysis for minimizing weighted mean flow-time in flow-shop
scheduling. Journal of the Operations Research Society of Japan, 23(2), 118-132.
Nawaz, M., Enscore, E. E., & Ham, I. (1983). A heuristic algorithm for the m-machine, n-job flow-shop
sequencing problem. Omega, 11(1), 91-95.
Palmer, D. S. (1965). Sequencing jobs through a multi-stage process in the minimum total time—a quick
method of obtaining a near optimum. Journal of the Operational Research Society, 16(1), 101-107.
Sarin, S., & Lefoka, M. (1993). Scheduling heuristic for the n-jobm-machine flow shop. Omega, 21(2), 229-234.
Singh, T. P. (1995). On 2 xn flow-shop problems invoving job-block, transportation time, arbitrary time and
break down machine time. PAMS, 21, 1-2.
Singh, T. P., Kumar, R., & Gupta, D. (2005). Optimal three stage production schedule, the processing and set up
times associated with probabilities including job block criteria. In Proceedings of the National Conference on
FACM, 463-470.
Smith R. D., & Dudek, R. A. (1967). A general algorithm for solution of n jobs, M machines sequencing
problem of the flow shop. Operations Research, 15(1), 71-82.
Tyagi, N., & Chandramouli, A. B. (2014). A new heuristic algorithm for two stage flowshop scheduling
problem. Proceeding of SOM 2014 IIT Roorkee, 642-646.
Yoshida, T., & Hitomi, K. (1979). Optimal two-stage production scheduling with setup times separated. AIIE
Transactions, 11(3), 261-263